Kes Geyser Load Control Timer Manual New Jun 2026
Do not exceed the maximum rated amperage (30A). Ensure all terminal screws are tightened firmly during installation to prevent loose contacts, which cause overheating and melting.
While holding , press D+ repeatedly until the correct day of the week appears at the top of the screen.
Press and M+ to set the time you want the geyser to turn off. kes geyser load control timer manual new
The main advantage of these timers is their simplicity, which helps save significant electricity without requiring complicated programming. The ISG1201, for example, features four pre-programmed "ON" operating profiles for user convenience.
Geysers are one of the biggest energy consumers in any household, often accounting for up to . A geyser load control timer is a smart device designed to tackle this issue by automatically managing your geyser's operation, ensuring it runs only when needed. This not only slashes your energy consumption but also helps reduce strain on the national power grid. Do not exceed the maximum rated amperage (30A)
Always switch off the main electrical supply at the circuit breaker before touching any wiring. Verify the power is off using a reliable voltage tester.
The KES Geyser Timer is typically installed inside or directly next to your main Distribution Board. Press and M+ to set the time you want the geyser to turn off
Press to match the exact same day block you selected for 1 ON .
The KES Geyser Timer is designed to fit onto a standard 35mm DIN rail inside your distribution board (DB box) or a dedicated weatherproof enclosure.
The is a robust and effective solution for managing your home's energy consumption. Its pre-programmed profiles make it exceptionally easy to set up and use, offering a straightforward path to lower electricity bills without the need for complex daily adjustments. It is a device perfectly suited for homeowners who want a "set and forget" solution for shifting their geyser load away from Eskom's peak demand periods.
: Always ensure the mains power is switched off before attempting any internal wiring. Geyser Load Control Timer ISG1201 Guide | PDF - Scribd
